Mazar-e-Sharif 110 KV Cable Termination

HV cable termination is a very complicated and accuracy job.

During this procedure, the HV cable prepare to connect to the HV line or HV source. Implementation of this job needs special technical experience and knowledge. For the first time, in Afghanistan, our expert local engineers could implement installation, testing and commissioning of 6 sets 110KV HV Cable Termination with link boxes in Mazar-E-Sharif 220KV substation. By completion of this job, DABS can transfer energy via 110KV Power cables from power transformer to 110KV outgoing line. This job totally completed by Shahab Niru local engineers by using the special tools. Now we have the ability to perform all kinds of HV cable termination and standard tools are available for this part.

Blog Search

About Us

The Shahab Niru main fields activities on EPC base are as follows - Power plants - High voltage substation up to 500 KV - High voltage transmission lines up to 400 KV - Distribution and Electrical network of Industrial