Badghis110 KV Transmission Line

  • Home
  • Badghis110 KV Transmission Line
Badghis110 KV Transmission Line

Badghis110 KV Transmission Line

The project is in Badghis province; this project’s scope included civil work, tower installation, overhead conductor, OPG wire with all accessories, and testing and commission of transmission line. The length of the 110 KV transmission line is about 52 KM from Qala-e-now to the Turkmenistan border. The owner of this project Is MEW, and the prime contractor is Sunir Company. The project was completed in 2017 as per the project schedule.